⛵ Sailboat DB

9,220 boats found — page 55 of 185

Name LOA (ft) Beam (ft) Draft (ft) Disp (lbs) Rig Cap. Ratio SA/D D/L Year
ESTE 31 31.27 10.5 6.23 6,614 Fractional Sloop 2.24 20.2 144 1999
ESTUARY ONE-DESIGN (UK) 18 6 0.9–3 850 Fractional Sloop 2.53 37.4 81 1911
ETAP 20 19.85 7.55 1.57–3.74 1,874 Fractional Sloop 2.45 19.4 168 1975
ETAP 21i 21.52 8.17 2.3 2,712 Fractional Sloop 2.34 21.2 151 1997
ETAP 22 21.65 7.87 4.1 2,756 Fractional Sloop 2.25 17.5 188 1974
ETAP 22i 22.24 8.1 1.31–4.1 2,149 Fractional Sloop 2.51 17.6 163 1983
ETAP 23 24.2 8.2 2.6–5.08 3,320 Fractional Sloop 2.20 13.7 216 1982
ETAP 23i 22.44 8.17 2.3–4.8 3,306 Fractional Sloop 2.19 14.8 214 1982
ETAP 23il 25.5 8.18 2.3–4.82 3,420 Fractional Sloop 2.17 22.0 182 1994
ETAP 24i 26.31 8.2 2.79 4,012 Fractional Sloop 2.06 20.7 168 1999
ETAP 26 25.75 9.02 3.11–5.25 5,084 Fractional Sloop 2.10 15.5 224 1982
ETAP 26i 25.75 9.12 3.77 5,071 Fractional Sloop 2.12 15.0 175 1994
ETAP 26s 26.31 8.2 4.92 3,968 Fractional Sloop 2.07 20.9 166 2005
ETAP 28 27.62 10 5.4 6,610 Masthead Sloop 2.13 14.5 253 1978
ETAP 28i 27.99 10.25 5 6,173 Fractional Sloop 2.23 17.0 205 1988
ETAP 28s 29.46 11.02 5.77 8,157 Fractional (7/8) Sloop 2.19 17.3 171 2007
ETAP 30 29.6 10.33 5.9 7,940 Fractional Sloop 2.07 16.2 225 1985
ETAP 30cq 29.46 11.02 5.77 8,157 Fractional Sloop 2.19 17.3 171 2009
ETAP 30i 29.33 10.38 5.58 7,715 Fractional Sloop 2.10 15.7 190 1995
ETAP 32i 30.67 11.22 4.6 9,763 Fractional Sloop 2.10 20.6 241 1992
ETAP 32s 32.25 11.25 5.92 8,157 Fractional Sloop 2.23 22.1 175 2003
ETAP 34s 34.87 11.55 6.07 10,000 Fractional Sloop 2.14 23.4 169 1997
ETAP 35i 34.84 11.52 5.09 11,464 Fractional Sloop 2.04 210 1992
ETAP 37S 36.94 12.63 6.4 13,999 Fractional Sloop 2.10 22.7 182 2003
ETAP 38i 37.96 12.7 5.09 14,120 Masthead Sloop 2.10 16.4 193 1989
ETAP 39s 38.98 12.63 6.4 14,991 Fractional Sloop 2.05 17.1 179 1998
ETAP 46ds 47.44 14.44 5.09 28,329 Fractional Sloop 1.90 19.2 183 2006
ETAP 48ds 47.44 14.76 6.73 29,101 Fractional Sloop 1.92 14.2 188 2009
ETCHELLS 30 29.95 8.67 4.58 5,720 Masthead Sloop 1.94 19.9 163 1970
ETCHELLS CLASS 30.5 7 4.5 3,325 Fractional Sloop 1.88 21.6 139 1966
ETENDARD 29.89 9.68 3.77 9,259 Masthead Ketch 1.84 16.5 289 1968
EUPHORIA 54 54 15.08 8 39,500 Fractional Sloop 1.77 24.7 160 2014
EUROPA TS240 21.65 8.33 1.48–5.05 3,527 Fractional Sloop 2.19 207 1999
EUROPE (INTERNATIONAL) 11 4.42 99 Cat (Marconi) 3.82 56.8 33 1963
EUROS 39 (AMEL) 38.58 10.83 4.92 14,551 Masthead Ketch 1.77 15.0 279 1966
EUROS 41 (AMEL) 40.52 10.83 5.41 15,432 Masthead Ketch 1.74 15.0 214 1972
EVAN'S 16 16.33 6.42 0.67–3.83 480 Fractional Sloop 3.28 43.1 1975
EVASION 22 (BENETEAU) 22.8 8.53 3.28 3,968 Masthead Sloop 2.15 18.9 251 1980
EVASION 25 (BENETEAU) 26.9 8.73 3.84 6,063 Masthead Sloop 1.92 19.2 279 1978
EVASION 28 (BENETEAU) 27.89 9.5 4.1 9,480 Fractional Sloop 1.79 17.0 417 1978
EVASION 29 (BENETEAU) 30.84 10.17 4.76 8,818 Masthead Sloop 1.97 18.1 246 1980
EVASION 32 (BENETEAU) 31.82 9.84 4.5 12,676 Masthead Ketch 1.69 15.4 412 1973
EVASION 34 (BENETEAU) 35.76 11.42 5.09 12,125 Cutter 1.99 20.1 217 1982
EVASION 36 (BENETEAU) 35.43 12.63 4.75 12,125 Masthead Sloop 2.20 20.6 168 1990
EVASION 37 (BENETEAU) 37.17 11.75 4.07–7.75 17,637 Masthead Ketch 1.81 20.6 257 1980
EVELYN 25 24.75 8.67 4.4 2,600 Masthead Sloop 2.52 25.0 117 1984
EVELYN 25.5 25.5 9 4.4 4,200 Masthead Sloop 2.23 20.0 170 1981
EVELYN 26 26 9.5 4.5 4,200 Fractional Sloop 2.35 20.2 189 1980
EVELYN 26 FD 26 9.5 1–5 4,200 Fractional Sloop 2.35 20.1 189 1978
EVELYN 32 32.1 9.8 6 4,500 Masthead Sloop 2.37 25.9 90 1983
← Prev Page 55 of 185 Next →